PART XI SCAFFOLDS, STAGES AND WORK PLATFORMS — Access to scaffolds
166
(1) Access to otherwise inaccessible working levels of a scaffold up to 9 metres above a floor or grade shall be provided by
166(a)
end frames providing a ladder-like structure having horizontal members uniformly spaced at approximately 30 centimetres on centre; or a stairway erected for the full height of the scaffold;
166(b)
a vertical or portable ladder or stairway, attached to the scaffold. a temporary passenger hoist approved for use under the Public Safety Act ;
166(2)
Access to otherwise inaccessible working levels of a scaffold over 9 metres above a floor or grade shall be provided by
166(c)
an attached vertical ladder, with rest platforms at least every 6.1 metres which are fully guarded except at the ladder location; or
166(d)
end frames with a ladder-like structure having horizontal members uniformly spaced at 30 centimetres on centre, and rest platforms at least every 6.10 metres which are fully guarded except at the ladder location.
166(3)
A worker shall not climb the outside of scaffold frames between landings.
Not legal advice. Verify the cited article against the signed agreement.