STU
NL · Occupational Health and Safety Regulations (workplace standards) · Article 370 · clause 370 · NLR 5/12

PART XV RIGGING — Multiple piece lifts

370

For each multiple piece lift,

370(a)

each member of the lift that is being delivered to a different spot shall be independently slung back to the main load hook or master link using graduated length slings;

370(b)

a lifted member shall not support another lifted member; and

370(c)

a crane equipped with power controlled lowering shall be used.

Not legal advice. Verify the cited article against the signed agreement.