PART XVII CONSTRUCTION, EXCAVATION AND DEMOLITION — Temporary support
382
During the erection or dismantling of a structure or equipment, the employer shall ensure that a partially assembled structure or component is to safely withstand loads likely to be imposed on it.
Not legal advice. Verify the cited article against the signed agreement.