Jurisdiction of Work for Rodmen
38.05
All field fabrication in connection with any or all of the above mentioned.
38.01
Post tensioning, including grouting, pre-stressing of, handling by power, racking, sorting, cutting, bending, hoisting, placing, burning, welding, and tying of all materials used to reinforce concrete construction.
38.02
Re-aligning of reinforcing steel, wire mesh and placing steel dowels, as well as re-fastening and re-setting same while concrete is being poured.
38.03
Reinforcing steel and wire mesh in roadways, sidewalks, and bridges in connection with new construction, also erection and fabrication, pre-stressed and pre-cast roofs, tanks, manholes, trenches and covers.
38.04
The handling and placing of “J” or Jack Bars on clip form construction. The placing of all clips, bolts and steel rods, and wire fabric or mesh pertaining to gahnite construction, and the placing of Steel Tex or Paper Back mesh used primarily for reinforcing steel.
38.06
It being understood that handling by any method of pre-stressed joists and pre cast, beans, columns, slab-walls, or concrete pan panels shall be performed by, and comes under the jurisdiction of the Structural lronworker of Local Union No. 764.